About Project

Project Introduction

Four-laning of Dhangaon – Boregaon section of NH-347BG & 753L (Indore to Boregaon- Pkg IV) Design Ch.81.000 to 139.000 (Length 58.000 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on Hybrid Annuity Mode

The stretch provides major connectivity between Indore city and Indore Bypass. The existing two-lane road configuration is proposed to be augmented to four lane with 6-lane structures keeping in view of the growing importance of road network in the state and its physical, social, economic and environment fabric and shall cater the mixed traffic volume of commercial vehicles as well as private vehicles

Project Corridor

The road primarily runs in N-S direction and connects Indore, Khargaon, Khandwa and Burhanpur districts and other important Blocks and Tehsil Headquarters located enroute. There is provision of six number bypasses along the project road namely Daudwa, Deshgaon, Chhegaonmakhan, Rutumpur, Kumthi and Borgaon Bypass with suitable crossing facilities.

Project Corridor

Working Strategy

High Quality Construction Management

The main goal of the KCC is to ensure that construction projects are successfully completed within the constraints of the best quality, stated period and at minimum possible cost.

Eco Friendly Construction:

KCC’s working strategy involves the use of materials and processes that are resource-efficient and environmentally responsible throughout the life cycle of construction.

Drone Monitoring:

We use drones and UAV like emerging technologies  to reduce project time, improve safety and control project costs. 